Mechanical Engineering Resume: Sample and Free Template [2020]
Use these Mechanical Engineer Resume Sample Bullets to create your Resume and land your dream job. All of these can be accessed for free in our in-product Mechanical Engineer resume templates. Explore them below.
Search Mechanical Engineer Resume Bullets for your Resume:
Developed and maintained a variety of engineering designs for the design and development of new equipment
Developed a prototype of the system to test and evaluate a new product for the purpose of improving efficiency and reliability
Developed new process for laser cutting and assembly of parts for the laser cutting department
Developed custom tool and equipment for the production of high pressure, low voltage and power distribution systems
Developed designs for the following systems and equipment
Developed detailed engineering specifications for the new and modified components of a large scale, multi-million pound
Developed & Imported new and improved process control procedures for the manufacturing of high pressure, low voltage and power supply components
Developed and maintained a detailed understanding of the manufacturing and installation processes
Developed design and installation of electrical components for the manufacturing and distribution of automotive parts
Developed the first and second stage of a mechanical engineering program for the first time in a major automotive industry
Developed the first automated system for a large, complex mechanical plant
Developed detailed design of a hydraulic actuators for the purpose of improving efficiency and performance
Developed and implemented a process for the production of new and modified hydraulic systems
Developed a prototype of the first mechanical device for a new medical equipment
Developed, implemented and managed a new software system for the manufacturing of a wide range automotive components
Developed the design and implementation of a mechanical control panel for the new production facility
Developed manufacturing process and equipment for the new production of a high speed, multi dimensional injection molded plastic product
Developed test procedures and performed quality control on the product
Developed & implemented a system to track and report on the performance of all plant and equipment
Developed detailed drawings and plans for new construction
Developed all electrical and instrument control systems for the production of industrial and commercial aircraft
Created and implemented a new CAD program for the entire company
Created new processes and procedures for the design of a high-speed mechanical system
Assisted in the development of a prototype for an electronic component
Assisted with the development of a prototype for an automotive
Assisted engineering department with design and fabrication of mechanical systems, including electrical and electronic controls
Assisted engineers in the design of a prototype for an automated system
Assisted customers with the installation of their electrical equipment and systems
Assisted on the development of a prototype for an automated assembly line
Assisted and supervised the design of a prototype for an automated system
Assisted in the installation of a hydraulic pump and control systems
Assisted the engineering group in developing a prototype of the system
Assisted customers with technical support and repair of all electrical components
Assisted customers with the purchase of their automotive components, and provided technical guidance to ensure that the customers received their vehicles in a professional and satisfactory manner
Assisted customers with technical support and repair of equipment, parts or systems in a variety of industries
Assisted manufacturing with the fabrication of new and modified equipment for the production of a wide variety parts
Assisted production with new and updated parts
Assisted manufacturing with the fabrication of a prototype for an automotive company
Assisted Project Manage and Design Engineer with the installation of new equipment and components
Assisted Engineers in the development of a prototype for an electrical system
Assisted design and construction of the following mechanical equipment
Assisted General Electric in the development of a process for replacing the existing electrical system with a new electronic component
Assisted Manufacturing Engineers with the creation of a CAD model for the new plant
Assisted in the design and implementation of a prototype
Assisted with the design and implementation of a process for the manufacture and installation of a new product line
Assisted the engineering team in developing and testing the mechanical design of a new prototype
Assisted customers with technical support and troubleshoots, including troubleshot mechanical issues with the company computer, and performed troubleshot of the computer
Assisted customers with technical support and troubleshoots, including troubleshot mechanical systems; performed repairs and upgrades to equipment
Assisted customers with the selection of their vehicles and parts
Assisted Engineering in the fabrication of new and modified equipment
Assisted and supported the engineering department in developing and testing the design of a hydraulic actuator for the use of a hydraulic pump
Assisted and supervised the installation of new equipment and parts
Assisted and supervised the fabrication of new equipment and modifications to the current system
Assisted design engineers in the development of a prototype
Prepared and submitted reports, drawings or engineering specifications to the customer
Prepared drawings and schematizations for the design of a new hydraulic pump system
Prepared detailed engineering documents for the fabrication of new and modified components
Prepared work order and tool list for new equipment, performed quality checks on all new equipment, and maintained tool inventory
Prepared all engineering documents for the installation of new and modified equipment
Prepared design drawings and specifications for the fabrication of mechanical systems
Prepared design documents and drawings for the installation of a hydraulic system
Prepared technical documents for the development of new and modified components
Prepared project schedules and estimates for construction, sub-projects
Prepared schematic and design drawings for the installation of a variety types and materials
Prepared engineering documents and technical drawings for the new product line
Prepared detailed engineering reports for the project team and presented findings to senior engineering team
Prepared work schedules for the production of a wide array and complex mechanical systems
Prepared specifications and technical documents for the development of a hydraulic system for the production of a high pressure steam generator
Prepared product specification and manufacturing documents
Prepared structural and electrical layouts for the new facility and completed all necessary electrical work
Prepared the design and layout of a prototype for the new product
Prepared for and conducted a new product launch for the first time in a new plant
Prepared engineering drawings and layouts for new construction
Prepared design documents and specifications for new equipment, including mechanical and structural design of equipment
Prepared project drawings and detailed plans for the design of a large scale, custom built and modular building
Prepared schematic and detailed drawings for the installation of electrical and mechanical equipment
Prepared the drawings for new and existing equipment
Managed the development of a process for an electronic control device
Managed a crew of 6 to 12 people in the production of a variety parts for the automotive and industrial industries
Managed projects from start to completion, and provided engineering direction for new projects
Managed projects from start to completion, and coordinated with other departments to complete projects
Managed engineering and design projects for the company
Managed shop and tooling inventors
Managed a group of CAD designers and technicians to develop a new product
Managed engineering and technical resources for the development of a high-speed hydraulic system for the production of high speed industrial machinery
Managed design and installation of mechanical systems for the manufacturing and distribution of automotive parts
Managed production of custom built and fabricated components for the aerospace industry
Managed the design and fabrication of a variety mechanical systems for the automotive industry
Managed and supervised the installation of new equipment and modifications to the production line
Managed projects from start to completion
Managed multiple projects and supervised a team of 5 mechanics
Managed project schedules and coordinated with engineering to meet customer requirements and deadlines
Maintained the shop and equipment in a safe, sanitized condition
Maintained high quality production and tool room equipment, while ensuring the highest level of quality and safety
Maintained detailed drawings and specifications for the following projects
Maintained quality standards and procedures for the production of all products
Maintained detailed knowledge of all phases and procedures involved in the design, construction and commissioning of new equipment
Maintained quality standards for all parts and materials
Maintained high level of customer service and professionalism while providing a high level of customer service
Maintained plant and production schedules
Maintained high quality of work by using a wide range of tools and materials
Maintained high quality of parts and assemblies, using hand-tools
Maintained and operated a wide array of heavy machinery and power tools
Maintained a clean and sanitize environment for the entire plant
Maintained accurate and up to code production sheets for each machine
Maintained equipment and supplies in a safe, operatory condition
Maintained current and future drawings for all products in the field
Maintained high quality work and safety procedures, as per OSHA standards and company policies
Maintained records of the production, testing and quality control of the product, including all required documentation
Maintained and repaired various pieces of equipment, such As pumps and motors
Maintained all aspects of the plant including but was also responsible for the installation of new equipment and systems
Maintained accurate and up keep of all parts, equipment and supplies for the company
Maintained accurate records of parts and materials
Maintained an accurate and up to date inventory of the parts and equipment
Maintained high standards of cleanness and sanitation in the work areas, including restrooms and equipment
Maintained an inventory of over 100 pieces
Maintained detailed engineering and manufacturing documentation
Maintained accurate and up keep of all engineering documents, drawings and schematings
Maintained engineering drawings and technical documents
Provided customer support for the design and installation of a variety mechanical systems and equipment
Provided quality assurance and engineering services to the company
Provided expertise in the design and installation of new laser equipment
Provided technical guidance and support to the engineering department on design, development of new and modified components
Provided technical assistance to the design and development of a prototype
Provided design and development for a variety of manufacturing systems
Provided assistance to the Mechanical Engineers in designing and building the new plant layout
Provided high quality and accurate machined components for the aerospace industry
Provided leadership and guidance to the engineering group in developing and executing the design, fabrication of new products and equipment
Provided leadership and guidance to the engineering department in developing and executing the design of a new hydraulic system for the production of a high speed, low pressure liquid cooling water treatment system
Provided oversight and supervision of the design process for a new mechanical assembly line
Assist engineers in the development of mechanical and electronic systems for the production of industrial and commercial products
Assist customers with the installation of their new and used automobiles
Assist design team in the creation of new and updated designs
Assist mechanics in the design and development of mechanical components
Assist with the planning and development of new equipment, components or systems for the manufacturing of automotive parts
Assist the Engineering department in developing and maintaining the engineering system for a large scale project
Assist customers with any problems or questions regarding material and equipment
Assist engineers in the fabrication of mechanical parts for various applications
Assist plant in the implementation of process improvement
Assist with the development of new products and design changes
Assist the engineering department in developing and maintaining the drawings for a variety of different types and models
Assist the team in developing and implementing a process for the production of high pressure water treatment
Assist engineers in the creation of new products and designs
Assist engineering in the fabrication of new and modified parts
Assist customers with the design and installation of their vehicles
Assist design engineers in the development of mechanical and pneudomotor systems
Assist production with the development of new parts and components
Prepare, review and revise engineering drawings for the purpose of improving manufacturing processes and reducing costs
Operated various machines and equipment to perform the job duties of a Mechanical Engineering Technician
Operated the CMM, MRO and other mechanical tools
Operated all equipment in the production of a wide range parts for the automotive industry
Operated all aspects of the design and development process for a new product
Operated a forklifter to load and remove scrap materials from production floor
Operated power equipment to move and position materials
Operated power tools and other heavy equipment to complete job
Operated hand tools and other material handling devices to prepare and package products for delivery
Operated hand tools and precision measurement instruments to fabricating parts for the production of industrial and military vehicles
Provide support to the design and construction of new equipment
Maintain accurate and timely records of work orders
Maintain work flow and production schedules
Maintain an accurate and up to date inventory of the parts and equipment needed for each job
Coordinated efforts with other disciplines to develop and test mechanical components
Coordinated efforts with other departments to develop and maintain a manufacturing process for the production of a variety parts
Coordinated project activities with engineering and production teams to meet customer requirements
Coordinated multiple engineering disciplines to design and implement a variety of mechanical systems and equipment
Coordinated efforts with the Engineering and Production teams to develop, test & evaluate new product designs
Coordinated all phases of project from concept to production and design
Coordinated with engineering and design team to develop new product designs and test equipment
Coordinated the design and implementation of new product lines for the automotive and aerospace sectors
Coordinated all aspects of the project from concept to production
Coordinated work with other departments to ensure that the work was performed in a manner consistent with the company standards
Coordinated efforts with other engineers to develop and test prototype components for the production of a new hydraulic system
Coordinated daily work activities of the Material Engineering department to ensure timely and accurate material flow
Developed and maintained a database of over 200 engineering and manufacturing drawings for the company's new production facility
Developed and maintained a comprehensive engineering program for the design and fabrication of a variety mechanical systems
Planned and implemented a new mechanical engineering process for the company
Planned all aspects of the project from initial concept to final assembly
Planned new and revised existing designs for the new and used vehicles
Planned work and coordinated with engineers to develop new and improved processes
Planned work and assigned employees to meet manufacturing schedules and quotas
Planned all aspects of the fabrication and assembly process from initial design through production
Drafted and implemented a new mechanical system for the plant, which included a new mechanical system for the production line
Drafted engineering change requests, and coordinated with other departments to resolve issues and ensure compliance with company standards
Drafted engineering change requests, and coordinated with the Engineering Team to ensure all changes are completed in a safe and efficient mannor
Drafted the first mechanical engineering software for a major aerospace manufacturer
Drafted numerous design changes to the existing plant layout and equipment
Drafted technical specifications and engineering change requests for all major mechanical components
Drafted engineering drawings and design specifications for the new plant
Drafted & implemented a process for the production of new and existing parts
Supervised the production of a new product for the automotive market
Supervised all phases of the design, fabrication & testing
Supervised the design and installation of new equipment, systems or modifications to existing structures
Supervised design, testing & implementation of all mechanical systems
Ensured all parts and assemblies met the requirements of each customer
Ensured proper operation of all mechanical systems and components in the plant
Ensured quality of product, and maintained a clean working area
Ensured compliance with the design and manufacturing of all components
Ensured timely and efficient completion of projects by coordinating with project managers, engineering staff and vendors
Ensured alignment of parts and components to meet manufacturing specifications, using hand and power tool
Ensured production and maintenance of the plant equipment, tools and materials
Ensured timely and efficient completion of projects by coordinating with other departments and vendors
Ensured alignment of all components and systems to ensure the most cost-efficient and reliable system
Ensured a high quality product for the manufacturing of automotive components
Ensured safety and reliability of the plant
Ensured the safety of all equipment and materials on the rig
Ensured a high degree of accuracy and reliability in the manufacturing of mechanical parts
Ensured a high-performance and safe working facility by utilizing lean manufacturing practices
Ensured smooth and accurate work of mechanical systems in the fabrication and installation of new or modified equipment
Ensured high level of safety and reliability
Ensured the proper operation of all equipment and tools, including the proper use of all tools and materials
Ensured proper alignment of parts and assemblies, including the use of hand tools and precision measuring devices
Ensured quality of product and process
Ensured product quality and performance
Ensured safety and reliability of equipment
Ensured a safe and clean work environment for the entire team, and ensured a high level of customer service
Ensured a high quality, efficient and safe production line
Utilized Auto CAD to create and maintain detailed engineering documents for the design of new and existing equipment
Utilized Solidworks and Auto CAD to create detailed mechanical designs for various types of equipment
Utilized a CAD system to design and develop a prototype of the new system
Utilized SAP to manage inventory and purchase order processes, including purchasing of parts and supplies
Utilized engineering knowledge to design and develop a variety of electrical systems and equipment
Utilized Microsoft Office, Excel and PowerPoint to develop detailed engineering drawings
Utilized Six-axis and 3D CAD to create detailed drawings of the mechanical systems
Utilized CAD and Autoclaving techniques to produce mechanical assemblies
Utilized the following skills and knowledge to complete the job in a timely fashion
Utilized the following skills and experience to develop a variety of mechanical systems and equipment for the purpose of developing and testing a new system for the purpose of reducing and improving production
Utilized knowledge of engineering and design concepts to create mechanical systems and components for the manufacturing of industrial and residential products
Utilized Autodesign and Auto CAD to produce detailed engineering drawings
Utilized P&L and budgeting to ensure cost-effective production of parts
Utilized knowledge of the mechanical engineering process to create and maintain the design of new equipment
Utilized MS Excel to track and maintain the progress of projects
Utilized Solidworks to assemble and install various parts of the sheetmetal
Utilized a variety of tools and equipment to perform the design, development and installation of new equipment
Utilized CAD software to produce drawings and layouts for new product
Utilized CNC and Autodesk CAD to produce parts for the company
Utilized SAP to manage the production schedule and inventory levels
Utilized Lean Manufacturing Process and Engineering principles to develop new processes and improve existing ones
Utilized engineering principles and practices to design mechanical components for the production of industrial and military vehicles
Utilized engineering principles and practices to design, develop,.
Utilized experience in the field of Mechanical Design and Manufacturing
Utilized blueprints and schematic drawings to determine the proper layout of components and tool boxes
Coordinate daily work flow and ensure that the project team is in alignment with the schedule and deadlines
Organized project schedule and coordinated with engineers to complete the projects
Organized project schedule and coordinated with other disciplines to meet project deadlines
Organized manufacturing processes and procedures to improve efficiency, increase production and reduce downtime
Organized and managed the work of a group consisting primarily engineers and technicians to ensure the completion of all projects
Organized shop layout for all new and used parts; Maintained inventory of new and used equipment, including spare part catalog
Organized and coordinated all engineering projects for the plant and its associated departments
Organized a variety of materials and processes to improve production
Organized manufacturing processes and systems to improve quality, productivity
Organized a team of 3 to design and implement a new process for the manufacturing of a high-speed liquid cooling system
Organized material flow and installed components
Organized production schedules and monitored progress
Organized a team of 5 to design and implement a new system for the entire company
Conducted engineering and technical research on the development of a novel mechanical system for the purpose of improving efficiency and reliability
Conducted a wide array of quality assurance and inspection functions to ensure that product met specifications and quality requirements
Conducted design reviews and engineering changes to ensure quality, reliability and cost effectiveness
Conducted daily inspections of equipment and systems to identify potential hazards, deficiencies and possible safety issues
Conducted extensive research and design of new product designs for the automotive and aerospace markets
Projected and completed a new system for the production of a new hydraulic system
Projected and designed the design of a prototype for an industrial vacuum system
Inspected all parts of the aircraft for proper function and quality
Inspected the work of mechanical and electronic engineers to determine the most efficient and cost-effective methods of manufacturing
Inspected product for quality and compliance with customer requirements, using micrometer and gauges
Inspected and repaired various components of the plant machinery and performed preventive maintenance on the plant machinery
Inspected, repaired or overhaul of mechanical and hydraulic equipment to include pumps, compressors and actuaries
Inspected the work of various machines and made sure all the parts were in good order
Inspected components and systems for mechanical, hydraulic or electronic failure
Inspected finished products for conformation to customer requirements and met quality standards for production
Inspected new and replacement of existing components
Inspected completed parts for conformation to specification and assembled units according
Inspected structural components for the purpose of determining proper operation and repair
Inspected all parts for quality and compliance with customer specification
Inspected the parts for proper function and alignment, using micron gauges
Inspected electrical systems and assemblies for proper function
Inspected product for quality and adherence to specifications, using microneters
Inspected equipment and components for defects
Inspected products for quality and compliance with specifications, including those for packaging and assembly
Oversaw new and updated design of the entire mechanical engineering process
Oversaw project design and implementation of new products, processes
Produced high quality, accurate and timely production reports for senior leadership and management
Trained employees on the use of various tools and machinery, including forklift
Trained and mentor on all new products
Trained and supervised a staff of 10 Mechanical Engineering and Materials Technicians in the design, fabrication and assembly of various mechanical assemblies
Trained on the assembly of various parts for a large variety of different companies
Trained on the new system and how to operate
Trained to operate and troubleshot all mechanical components of the plant
Trained employees on the process and equipment used in manufacturing processes
Trained over 100 personnel in the design and construction of new equipment
Trained over 100 employees on the use of a new, more efficient and cost saving process
Trained staff on proper installation and maintenance of equipment, as well
Trained new employees on the use of Solidworks and Auto Cad, as they became familiar with the material and its use
Trained all new hires on the proper operation of all equipment and systems
Trained all new hires on the system and assisted in troubleshoots
Trained over 100 engineers and designers on the design of new and modified components
Reviewed and revised design drawings for the new and modified production machinery
Reviewed drawings and specifications to ensure proper installation of equipment and components
Reviewed engineering design and provided recommendations for improvements to the existing design
Reviewed designs and specifications to ensure conforming parts were in compliance with customer specifications
Reviewed technical documentation and provided recommendations for new products
Reviewed project plans and specifications to ensure that they are in compliance with the design and construction documents
Reviewed project plans and specifications to ensure that they are in compliance with customer requirements
Reviewed manufacturing processes and procedures to determine the best manufacturing practices
Reviewed and revised engineering documents to meet the customer specifications, and provided feedback to the customer
Reviewed engineering design drawings for compliance with customer specification, and provided engineering change orders
Reviewed engineering designs and specifications to ensure that all work performed met specifications, and to ensure that the design conform with applicable standards
Reviewed all engineering and manufacturing documents for compliance with the design and manufacturing specifications
Reviewed, analyzed & interpreted data to identify and solve design problems
Reviewed work performed by others to ensure that it is completed in a manner that will meet the requirements of customers and that they comply with the terms of their contracts
Reviewed blue prints for quality and quantity of work to meet customer requirements and specifications
Reviewed production schedules to identify manufacturing and tool changes needed to meet production schedule
Reviewed electrical drawings for the new and updated systems to determine the proper installation of electrical components
Reviewed new and updated schemas for the design of mechanical systems
Reviewed and approved drawings to determine the proper installation of components and systems
Reviewed blueprints and specifications to determine material, process or tool requirements
Reviewed work orders and provided technical guidance to the design team on new and modified components
Reviewed, approved and implemented all new designs
Reviewed work orders and specifications to determine material, labor requirements and machine operation
Reviewed production drawings and schedual specifications to identify manufacturing requirements and determine material, tool & process
Reviewed existing drawings and prepared specifications for the design of new and revised equipment
Review specifications and drawings to ensure compliance with applicable laws and regulations
Employed a wide range of mechanical and electronic engineering skills to design, develop and implement new products
Employed on the project team to develop and test the design of a high-pressure water treatment plant
Employed and maintained a variety of different mechanical and electronic components
Employed and managed a team of 5 Mechanical Engineering Technologists
Employed and maintained a variety of tools, equipment and systems to support the design, development and production of mechanical systems
Employed to develop and implement a process for the production of high-speed, low voltage components
Employed an engineering background in the field of Mechanical Design and Engineering
Employed knowledge of the following mechanical systems and processes
Employed a wide array of materials and tools to produce precision parts
Employed on a project to improve the performance of a large-scale electrical system
Employed extensive experience in the field of mechanical and structural drafting
Employed to develop and test various types of components, such as pumps,.
Employed wide range of engineering techniques to develop and maintain systems
Employed engineering techniques to improve the performance of various types and sizes
Employed wide range of engineering skills to develop and produce product designs for a wide array of products
Employed an Auto-Engineered design approach to develop a new product
Employed 3D models and drawings to create a new design for the entire plant
Employed a variety of welding and fabrication methods to complete projects on schedule and within budgets
Employed by the US Department of Energy to develop and implement a process for the production of high-voltages and low voltage electrical circuits
Employed to design and develop a laser that is used to cut and bend steel
Handled all phases of design and development for the new plant
Handled multiple tasks in a high-pressure manufacturing process environment
Handled various types of projects from design to installation and repair
Handled design and development of mechanical systems for the manufacturing and assembly of industrial machinery
Handled complex projects from design to production, and oversaw the development of new designs
Completed and maintained a variety of mechanical engineering and fabrication tasks
Completed a 3-week project to develop and maintain a new hydraulic fracturing system for the oil and water treatment facility
Completed a series of projects to improve the design and manufacturing of a new mechanical assembly line
Completed and maintained a high level of customer service, quality control and product
Completed numerous projects in the design and fabrication of new equipment
Purchased all components and assemblies for the company
Purchased the parts and equipment for a major overhaul of the company's manufacturing facility
Purchased and maintained all equipment, parts,. Maintained a safe work environment, and trained new hires
Purchased new parts and supplies for the company's production plant
Purchased a variety of components and materials for the manufacturing of various types and sizes
Purchased the necessary materials and tools to perform the project
Researched and resolved problems with existing tools
Researched new and innovative ways to reduce the cost of production
Researched & developed a new tool for the manufacturing of a new hydraulic actuator
Researched various components of the design and created a prototype for the new system
Researched various types of materials and processes to improve the design of new and existing equipment
Researched potential new technologies and created a detailed engineering document for the new system
Researched potential solutions to improve the quality of production and efficiency
Researched potential process improvement opportunities
Researched current and new technologies to develop a process for the production of high-speed, low voltage components
Researched and wrote detailed design drawings for the development of a new hydraulic fracturing system
Researched & developed a CAD program for the company
Researched design and construction problems, developed solutions
Researched current and potential issues with the existing design and implemented a new system to increase efficiency and reliability
Researched issues and developed new methods to reduce downtime and maximize efficiency
Researched engineering concepts and created design drawings for a wide array of products, including electrical and mechanical systems for a large scale industrial manufacturing company
Researched electrical and hydraulic issues
Researched new technologies and methods for improving the reliability of mechanical components and systems
Researched & developed a system for the production of high-speed hydraulic actuaries
Researched process improvements and developed new processes to meet the needs of customers
Researched various components of the plant and developed a plan to replace the existing system
Researched issues and developed new processes to meet the requirements of customers and suppliers
Researched current and potential issues with existing systems
Researched potential solutions to improve the reliability of mechanical equipment
Researched a new method of producing high quality components for the aerospace and defense sectors
Inspects and analyzes components of the electrical systems and assemblies
Inspected and replaced defective assemblies, components or wiring for electrical systems and equipment
Inspect the work of mechanical and electrical systems, equipment or parts to ensure adherence with specifications and established work practices
Directed a group of engineers and designers to develop a prototype of the company's first mechanical system
Directed development of a new mechanical design for the company
Directed and supervised the installation of new equipment and processes
Directed engineering change requests and provided technical guidance to the engineering group on new product design and manufacturing
Directed technical and engineering activities for the development of a new mechanical product for the automotive industry
Led a group of engineers to develop and test a prototype of the first mechanical actuator for a commercial vehicle
Led team of 5 engineers in the development and testing of a new process for the production of a high-speed liquid oxygen gas compressor
Led all phases of the project from design, construction and commissioning to final assembly
Led all aspects of the project from concept to final design
Led an effort to develop a system for the design of an automated conveyor belt
Led teams of 5 engineers and 2 production technicians in the development of a new process for the manufacturing of a high pressure water heater
Led the development of a process for an electronic sheet material
Led efforts to improve the quality of materials, process flow and equipment performance
Led efforts to design and build a prototype of the company's first automated assembly process
Led efforts to improve the manufacturing processes and reduce costs while increasing efficiency, quality and productivity
Led a team of engineers to design and build a new product for the automotive market
Led engineering change and implementation of new process
Led teams of 5 to 15 engineers in the fabrication of mechanical and electrical equipment
Led major design and implementation of new mechanical system for the production of a wide range automotive components